Following a recent spate of fire accidents on refining and petrochemical plants, we speak to some of the industry's top fire safety experts at EPConsult Energies to find out what are the common causes and how they can be avoided:   
At the EI Energy Systems conference, 14th and 15th June, EPEn had the privilege of presenting our new AIP Seven/Seven Method - The Asset Integrity & Performance Method. To find out more about our AIP Seven/ Seven Method please click the poster below.
At the EI Energy Systems conference, 14th and 15th June, EPEn had the privilege of presenting our new HSSES Seven/ Seven Method – The Health, Safety, Social, Environment & Security Method. To find out more about our HSSES Seven/ Seven Method please click the poster below.  
Engie in the UK is progressing plant facilities for a fertiliser plant, where power generation and heat will be provided by Engie. The Cheshire plant will provide Fertiliser for agriculture. EPConsult Energies is supporting Engie with facilities design, process safety, including advise and training in HAZID, HAZOP and SIL assessment. 
EPConsult Energies - An introduction to our Specialist Consultancy Service. Video - May 2016 
EPConsult Energies is pleased to launch our Double Footprint approach, which will provide operators with a de-risked high integrity approach for implementation of their energy projects. To understand more have a look at our Double Footprint page.
Amtek Aluminium – an Energy Audit was conducted at the premises of Amtek Aluminium in order to identify energy saving opportunitiesThe proposed measures in the report had the potential to lead to an overall reduction in energy usage by up to 32% with a potential saving of more than £600,000 per year. The revenue generated from the energy saving measures could be £4.9m in 10 years and the environmental benefit could reach 3,…
Hear how we provide Efficient Low-Cost Asset Integrity Management Solutions in a Low Oil Price Market. Podcast - March 2016 
OVL – CAPEX Re-Estimate for the Farzad B Gas Field. As part of performing an update to the Master Development Plan for the Farzad B gas field, located in the Farsi Block in Gulf waters, EPEn has prepared an update to the original CAPEX Estimate for the full field development project. The block has an area of about 3500 sq km in water depths ranging from 20-90m. The development includes production wells, offshore platforms, inter-field pipelines…
Energy Business Summit – EPConsult Energies is Chairing a Workshop on “Driving Down Costs through Emerging Technologies” - UK Energy Business Summit – London 14 April, 2016. Technology, Efficiency and Optimisation are key factors in targeting the challenges relating to securing energy supply going forward. If we can introduce new technologies to control processes for energy production, transmission and consumption, be smarter about it, we…