Schedule, Cost & Economics
During the different phases of development engineering planning we continue to refine the Development Schedule, the CAPEX, the OPEX and the Economics.
Performing these crucial tasks requires significant experience and great understanding of the key drivers behind schedule, work breakdown structure (WBS) planning and oil and gas life cycle costs and economics. The teams at EPConsult Energies have that experience – backed by state-of-the-art software, tools and data bases.
We make use of commercial software, in-house software and maintain data bases in order to drive the best oil and gas life cycle cost (LCC) estimates for production. It’s all focused on optimising your energy project..
The level 1 activities in a development schedule typically include:
-
Concept engineering
-
Field development approval
-
Geotechnical survey / Geophysical survey
-
Permits and EIA
-
FEED
-
Detailed engineering
-
Procurement
-
Transportation
-
Pre-fabrication
-
Construction
-
Pre-commissioning
-
Commissioning
-
Hand-over
-
Float / contingency