EPConsult performed a Fire Risk Assessment (FRA) of the facilities using PHAST modeling software to identify hazards to the new facilities, evaluate potential consequences associated with identified failure events, evaluate the level of risk associated with the adopted operation, identify, where appropriate, risk reduction measures to achieve ALARP and present results in terms of individual and group risk, risk to assets, environment and…
Al-Khafji Joint Operations (KJO) is a joint venture between Aramco Gulf Operation Company (AGOC) and Kuwait Gulf Operation Company (KGOC). EPConsult has developed a corporate risk management framework, policies and procedures for six business units including 23 individual departments. The project identified and captured the risks using EPConsult's risk management tool, EPRisk, in order to create a comprehensive Risk Register. EPConsult carried…
EPConsult reviewed the proposed process design of the FPSO topsides. Peregrino is a highly viscous 14 API heavy oil. The scope of the review was the separation and water treatment facilities. Design changes were recommended to improve product quality and operability. 
EPConsult successfully facilitated a program of FEED phase HAZOPs for GASCO Integrated Gas Development project on Das Island, Habshan and Ruwais. A total of 23 HAZOPs, of average 7 days each were successfully facilitated, recorded and reported along with 3 SIL assessment workshops. 
EPConsult produced the hazard register, fire risk assessment/training plan and an oil spill risk/contingency plan for Royal Haskonings' FEED phase New Jetty Development at Massawa Port. 
EPConsult provided the Independent Verification Report (IVR) required by ADNOC for the EPC phase of the Das Island OAG-1 Project Health, Safety and Environment Impact Assessment (HSEIA). 
EPConsult Energies supported Mobil North Sea in successful execution of this critical third-party tie-in to the significant SAGE pipeline. The work involved hot-tap facilities optimization including valve manufacturer quality control, hot-tap valves reviews and FMECA. 
EPConsult provided SIL Assessment Training course to discipline engineers at Bechtel London as part of GASCO onshore gas procession project. 
EPConsult has performed a pipeline installation QRA for the pipeline system that will feed the Idku ELNG facilities. The QRA identified high risk activities and recommended mitigation measures that will reduce implementation risks when completing the project. 
Carried out RAM study for the KG-D6 (MA), which is an oil and gas-condensate development in deepwater offshore India. The RAM study comprised the complete subsea production system, the FPSO and the export system.