EPConsult prepared a RAM Study for the Offshore Associated Gas Project, Pack 1 at Das Island. The study identified critical system designs and issues regarding logistical delays. Recommendations were adopted to meet the target availability. 
EPConsult supported Nexen UK with process systems and reliability study to study and provide recommendation to ensure that instrumented protection systems against high level H2S ingress were adequately designed. 
EPConsult has performed ultra-deepwater and onshore pipeline studies for the Galsi pipeline project spanning Algeria to Northern Italy. EPConsult prepared HAZID, QRA, Pipeline Integrity Study and RAM study. 
As part of the provision of HAZOP and SIL assessment services to PDVSA NGL V Fractionation Project, EPConsult provided a SIL Analysis Training Course to PDVSA. 
A team of EPConsult Engineers and Consultants conducted HAZOP Reviews, SIL Reviews and performed SIL Validation report for the NGL V Fractionation Project in Venezuela. 
EPConsult completed a detailed review and mark-up of Safety, Environment, Risk and Loss Prevention deliverables for the El Merk Project FEED Phase. The documents were re-issued as part of a bid for the El Merk Detail Engineering scope 
EPConsult worked with Total and JP Kenny in modelling the complete subsea production system and carried out cost benefit analysis work in order to demonstrate investments that would support the project in achieving the target availability of the production facilities 
Kuwait National Petroleum Corporation (KNPC) and its FEED/EPC contractor SK Engineering, commissioned EPConsult to perform a Value Engineering Study for the Fourth Gas Train Project at Mina Al-Ahmadi Refinery. The study helped client and contractor to identify cost saving opportunities and areas of risk reduction. 
EPConsult has performed a detailed QRA for the West African Gas Pipeline, which will provide gas for power generation through a main pipeline with spur lines to Benin, Togo and Ghana. Recommendations from the study are being implemented. 
EPConsult has completed the conceptual design and cost estimates for a range of subsea pipelines from 10-inch to 52-inch diameter. In total, six main options were covered together with a number of sub-options. The design and cost estimate took account of the requirement to construct the pipelines in various locations throughout the world. EPConsult also considered novel construction techniques for the pipelines in order to reduce CAPEX cost.…