EPConsult Energies has recently completed a study to help Saudi Aramco optimise its fleet of supply, logistics and safety vessels for its large ongoing drilling programmes. The purpose of the study was to improve efficiency and reduce OPEX, without compromising risks. The study identified a number of areas where improvements could be made thereby increasing efficiency and reducing overall costs.  
EPConsult Energies has provided Principal Consultants to supplement the company review team in the performance of a PEER review in order to assess the readiness of the Knightsbridge project for sanction.  The scope of the review was to establish the maturity of the project work and review the project teams categorisation of the accuracy of the scope, estimate and schedule along with the perceived risks to carry into full execution.  Also to...
A Hazard and Operability (HAZOP) Review has recently been completed by EPConsult Energies as part of the TOTAL Lindsey Oil Refinery (LOR) Sulphur Degassing FEED project. The objective of the HAZOP study was to ensure the system is safe and to identify potentially hazardous deviations from the design intention as well as operability hazards and difficulties. Where necessary, actions were raised in order to reduce or eliminate identified hazards....
ADNOC and ZADO are implementing the Upper Zakum Artificial Islands Project. The project comprises the installation of five artificial islands that will serve as drilling and production centres for the future phases of the Zakum field. EPConsult Energies in collaboration with Sound Environmental Consultancy and Studies have performed a Health, Safety and Environmental HSEIA Study for the implementation of the UZAI Project. This involved HAZID,...
A Hazard and Operability (HAZOP) Review has also been performed for one train of the sulphur recovery facilities at the Petroplus Coryton Refinery. The results of the review are applicable for both trains in the new Tail Gas Unit and any modifications made to the existing Sulphur Recovery Units. The primary objective of the project is to increase the overall recovery efficiency of the existing sulphur recovery plants to 99.5%.
KBR, the Define Phase Engineering Contractor for the West Nile Delta (WND) facilities, employed EPConsult Energies to chair a Critical P&ID Review over a six week period during November and December 2010. The HAZOP format, utilising primary and secondary guidewords to analyse deviations from design intent, was adopted for the review of the main processes. A combination of HAZOP and What If Reviews was used to analyse the utility systems.A...
EPConsult Energies has recently completed a Reliability Availability and Maintainability (RAM) Study for the QP EPIC for the Phase II Ras Laffan Common Cooling Seawater System.The purpose of the study was to update the original RAM Study performed 3 years ago by making use of the operational data of the plant to verify if the predicted availability, and reliability was achieved and can be maintained through the plants operational life-cycle, and...
EPConsult Energies has performed a detailed OPEX and Maintenance Management Review for a North Sea field comprising platforms, pipelines and subsea facilities. The study has been summarised in a report making recommendation on how to improve organisation, activities and resources around integrity management, in order to improve efficiency and reduce OPEX.Following the results of the above study, EPConsult Energies were requested to provide...
This study includes reviewing the client supplied geo-science model and building a reservoir simulation model to optimise the field development including the number and location of wells. The facilities, flowlines and pipeline definition includes conceptual engineering, process simulation and design and flow assurance. The scope also includes identifying minimum facilities platforms, processing platform substructure options and crude oil storage...
ENPPI is performing EPC for Kharir Basement Phase 1 Project and appointed EPConsult to review the design and the target availability through performance of Reliability, Availability and Maintainability Analysis.